Trimaran Corsair 880 Construction Update #5

While work continues on the hull and deck of the trimaran Corsair 880, beam plugs are shaping up nicely. The beam plugs have been constructed in a very similar manner to the larger plugs. This begins with designing the framework on the 3d model before exporting these to a CNC machine to be precision cut and then assembled. These frames are then covered, glassed and filled and fired before a final top coat is applied and a mold is taken. The beams on a folding trimaran are under an incredible amount of load, a lot of engineering goes into the design and internal structure required to keep these impressive structures in tact.

What is the Corsair 880LEARN MORE>>

Sign up to receive more 880 development updates SIGN UP>>

corsair-880-trimaran-construction-update-7

By | 2022-05-13T11:21:56+07:00 April 30th, 2019|Technical Articles|Comments Off on Trimaran Corsair 880 Construction Update #5